- Posted using BlogPress from my iPhone
A tale of two Chouts
The Ultimate Indian Motocycle Hybrid, the marriage of a vintage Scout frame with a Chief engine!
The Alchemist
The essence of motocycle, picture a rigid framed vintage roadracer, leaf sprung fork, single pan saddle, hand gearchange, foot clutch, left hand throttle and the biggest production Indian engine of the time shoehorned into the best handling Indian frame of All time! A true hotrod, the looks of a stripped down wall bike on steroids!
Saturday, 25 August 2012
Fat tyres n Borranis
Fitted 4.00x18 dirt tyres to the Borrani rimmed Honda K4 wheels and got them on the Chout... Really balances the bike nicely and makes it feel bigger.


- Posted using BlogPress from my iPhone
- Posted using BlogPress from my iPhone
Thursday, 26 July 2012
Repositionimg the kicker mount
One of the issues with fitting a chief powerplant into a 101 chassis is that the kicker stud is too close to the pinion... Today i made a start on repositioning the stud.
First off i drilled a piece of flat 1/4" stock to fit snugly over the existing 101 stud

With a length of 7/8" roundstock as a kicker pivot i offered the kicker up into position so the teeth mesh but not too tightly

Having marked the centre of the stud i drilled a 1/2" hole and turned the roundstock down on the lathe to the same size

With the new pin loosely in position i marked it with room for a washer and circlip then parted it off

All clamped together ready to weld now.
- Posted using BlogPress from my iPhone
First off i drilled a piece of flat 1/4" stock to fit snugly over the existing 101 stud
With a length of 7/8" roundstock as a kicker pivot i offered the kicker up into position so the teeth mesh but not too tightly
Having marked the centre of the stud i drilled a 1/2" hole and turned the roundstock down on the lathe to the same size
With the new pin loosely in position i marked it with room for a washer and circlip then parted it off
All clamped together ready to weld now.
- Posted using BlogPress from my iPhone
Tuesday, 24 July 2012
Saturday, 21 July 2012
Finally got the powerplant fitted in the chassis
Friday, 20 July 2012
Thursday, 19 July 2012
Odd Jobs
Bars
I picked up a modified '30s chief bar centre during the gathering stages of the project, it had solid round bar stubs welded either side ( slightly squint!!!) to take risers and aftermarket bars.
Today i set it up in the lathe turned down the stubs to the same diameter as the inside of a set of old Triumph 1" western pattern bars that i got from Tony with the 101 frame.


A couple of cuts later

And they are ready for welding

- Posted using BlogPress from my iPhone
Today i set it up in the lathe turned down the stubs to the same diameter as the inside of a set of old Triumph 1" western pattern bars that i got from Tony with the 101 frame.
A couple of cuts later
And they are ready for welding
- Posted using BlogPress from my iPhone
Saturday, 14 July 2012
Crossbar... all welded and ground back
Tuesday, 10 July 2012
Thursday, 5 July 2012
Tuesday, 3 July 2012
Progress 2
Saturday, 30 June 2012
Progress
Friday, 29 June 2012
Frame mods Plan C ref 5.5 revision F
I looked at the flat plate template this morning, cut out the shape in rough from a length of 8"x1/4" flat stock ... Picked it up and decided it had no place on a hotrod motocycle.....
Change of plan. Length of 7/8" tube in the lathe, squared off at both ends and cut back at 45 deg. Then i cut 2 end slugs with 3/8" dowels to fit into 1/2"x1" flat drops, which will be countersunk and bolted to the 1" slugs fitted to the frame.



- Posted using BlogPress from my iPhone
Change of plan. Length of 7/8" tube in the lathe, squared off at both ends and cut back at 45 deg. Then i cut 2 end slugs with 3/8" dowels to fit into 1/2"x1" flat drops, which will be countersunk and bolted to the 1" slugs fitted to the frame.
- Posted using BlogPress from my iPhone
Wednesday, 27 June 2012
Progress
Started the day with a modified plywood mock up of the removable flitch plate to replace the crossbar

Then i found a length of 1.25" screwed rod in the railway yard and turned down a short length to use as slugs in the frame, to fut the plate in place

As i was doing that, a courier arrived with the blower, so i trial fitted it to see if it would go where i want it.... all fits in fine 8)

- Posted using BlogPress from my iPhone
Then i found a length of 1.25" screwed rod in the railway yard and turned down a short length to use as slugs in the frame, to fut the plate in place
As i was doing that, a courier arrived with the blower, so i trial fitted it to see if it would go where i want it.... all fits in fine 8)
- Posted using BlogPress from my iPhone
Tuesday, 26 June 2012
Frame crossbar
After having a long look and think about how best to replace the under tank crossbar, today i mocked up option two in Grizzy's sketch below


The steel version will extend 3" forward and pick up a fixing from the web of the front headstock casting, a fourth fixing will drop vertically from just in front of the seat hinge mount and pick up the headsteady

This will give 1.5" of clearance between the tanks to let me move the oil line fittings in there and aid cooling!
- Posted using BlogPress from my iPhone
The steel version will extend 3" forward and pick up a fixing from the web of the front headstock casting, a fourth fixing will drop vertically from just in front of the seat hinge mount and pick up the headsteady
This will give 1.5" of clearance between the tanks to let me move the oil line fittings in there and aid cooling!
- Posted using BlogPress from my iPhone
Saturday, 16 June 2012
Seat n feet
Picked up a package from parcelforce this morning that had come from Australia, complete subframe for my Messinger seat, sits a bit too far forward and high for my taste so I'll need to make up a longer front pivot bar and the spring mounts... once the rear guard is fitted.
Cast alloy scripted footboards c/o Tony @ Indian Trading



Posted using BlogPress from my iPhone
Cast alloy scripted footboards c/o Tony @ Indian Trading
Posted using BlogPress from my iPhone
Tuesday, 12 June 2012
Blower and SU
Thursday, 7 June 2012
The first cut!
With the Sport Scout away for the day at the MOT station in Inverness. I decided today would be a good day to cut the crossbar out of the 101 frame and see if i could get the motor sitting in nicely





Just as i was fitting the tanks this beaut of a 1936 MG TA pulled up! More pics of it on the Speedshop blog.
Posted using BlogPress from my iPhone
Just as i was fitting the tanks this beaut of a 1936 MG TA pulled up! More pics of it on the Speedshop blog.
Posted using BlogPress from my iPhone
Subscribe to:
Posts (Atom)